Projects

 

Click To View Details For Ongoing Projects MMSNY April-2017
Click To View Details For Ongoing Projects PLAN April-2017
 On-Going Projects-Status Upto April. 2017
 SL  Head No. of Projects Amount (in Crores)
1.  Plan Head 46 2466.71
2.  Additional Central Assistance 1 167.85
3.  C.R.F 5 27.74
4.  NABARD 135 5521.25
5.  ROB 1 27.27
6.  Non Plan 8 23.32
7.  Karpoori Chatrawas.   24 68.05
8.  B.D.F 4 45.03
9. BVVK 0 0.00
10.  Flood Shelter 97 85.76
11.  World Bank 58 534.47
12.  Deposit 10 726.30
13.  MMSNY 97 327.22
  Total 486 10020.97

 

 Completed Projects - during 2017-18 (upto August-2017)
(Amount in Rs. Crores)
 SL  Name No. of Projects Amount
1.  State Plan 5 52.59
2.  Non-Plan     4 12.54
3.  Additional Central Assistance    0 0.00
4.  B.D.F   0 0.00
5.  BVVK   0 0.00
6.  Central Road Fund 3 19.43
7.  Deposit   0 0.00
8.  Nabard Loan 15 72.45
9.  R.O.B. 0 0.00
10.  World Bank(Phase-I)   0 0.00
11.  World Bank(Phase-II)   1 5.24
12.  MMSNY   17 63.21
13.  Karpuri Chatrawas   0 0.00
14.  Flood Shelter   0 0.00
15.  Distt.RSVY   0 0.00
  Total 45  225.46

 

 

 Work Force
Posts of Chief Engineer to Junior Engineer of Engineering Cadre of Nigam are being held by officers on deputation from Road Construction Department of Govt. of Bihar. At present, working strength of Engineering Cadre is as follows:

 

 SL  Rank/Designation Sanctioned Strength Working Strength
1.  Chief Engineer 1 1
2.  Superintending Engineer 4 4
3.  Executive Engineer 23 23
4.  Assistant Engieer 66 46
5.  Junior Engineer 102 76
  Total 196 150

In other cadres, officers and staffs appointed by Nigam are working and their strength is as shown below:

 SL  Cadres Strength
1.  Class-I (FA) 1
2.  Class-II 4
3.  Class-III 93
4.  Class-IV 142
5.  Work Charged Staff        115
  Total 355

 

 Source of Income
Sources of income of Nigam are as follows:
  1. Centage charges @ 9% on the sanctioned cost of projects.
  2. Toll Collection
  3. Registration of Contractors
  4. Miscellaneous

In the field of toll collection, Nigam has collected a toll of Rs. 94.55 crores from 1975-76 to 2007-08. Out of this amount, Rs. 18.46 crores has been spent on completion of construction works of 19 projects, and Rs. 16.00 crores has been spent on different projects of other fields.